Construction of Way for the Massive Transport System of Pasto
Client: MUNICIPIO DE PASTO - AVANTE Start date: 2012-11-19 End date: 2013-06-18 Current status: Terminada Detailed description:
The paving of the 8th Street. West between Carreras 26 and 33 back of the Mayoralty of the City of Pasto. Includes rigid concrete pavement, curbs and sidewalks installed in prefabricated tile and paved bikeway.
See all artworks